Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.12984754

- Product Categories
- Friendly Links
Information Name: | Xining sewage lifting | integrated sewage lifting equipment | West Baoquan |
Published: | 2014-10-08 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | A) ordinary sewage, improve living conditions of application of wastewater. For new buildings, construction waste must be removed before use inside sewers. 2) PH value range of sewage, wastewater 4-10. 3) Temperature sewage, waste water does not exceed 40 ℃. 4) For the dining room, kitchen and bathroom including hair oily wastewater effluent, to be carried out before use to grease and hair treatment. 3 introduces the principle of automatic basement sewage equipment mainly consists of sets (sewage) water tank, lift pump, auxiliary sewage pump, control cabinet and the corresponding filters, piping, valves and other components. Control cabinet programming control, automatic operation, no staff on duty, lift pump 1,2 mutual backup, rotating operation. When equipment fails, the alarm system will automatically start smart sewage lifting equipment, alarm indicator flashes sewage lifting and audible alarm to alert staff on duty. In addition, the control cabinet as well as manually operated systems supply sewage lifting equipment, on-site emergency manual start and stop the pump. Equipment in addition to dual-pump configuration, as well as a single pump and four-pump configuration. Drainage specification "install sewage pump sump effective volume should not be less than the maximum of a sewage pump five minutes out of water", so sump more water is used, its volume will be relatively large, not only occupy a lot of space, but also consume a high construction costs. And the integration of sewage lifting equipment, sewage pump encounter problems if needed overhaul, it needs to be removed from the huge sewage pump sump, and to repair and maintenance work caused some difficulties. Drainage specification, "sewage pumps should not be more than six times per hour to start," so the sewage pump had to choose a larger flow range, in order to reduce the number of starts, additional investment in the initial equipment. Meanwhile, the deployment of installation and maintenance of special tools and lifting equipment and other long-term operation and maintenance costs are relatively high. Xining sewage lifting | integrated sewage lifting equipment | West by West Baoquan Baoquan water. This information consists of: providing West Water Treatment Equipment Co., Ltd. Baoquan (www.xianbaoquan.com), we are business alliance member, the integrity of the whole network certification vendor. Feel free to contact us, contact: Wang |
Admin>>>
You are the 29395 visitor
Copyright © GuangDong ICP No. 10089450, Baoquan West Water Treatment Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 29395 visitor
Copyright © GuangDong ICP No. 10089450, Baoquan West Water Treatment Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility